Home Projects TODO List
·
Dennis Lawter
Electrical
-
Upstairs Outlet-
staple the Romex
-
-
Server Outlets-
Jump Romex -
Install box -
Install outlet
-
- Better Server Lights
-
Buy 2 gang box -
Buy a matching switch to replace current switch - Remove current light switch gang box
- Replace light switch box with 2 gang
- Install new switches
- Drill ceiling
- Install lights
-
- Sketchy Garage Outlet
- Replace or Remove
-
Sketchy Kitchen Outlet-
Buy longer screws -
Mount outlet with new screws
-
- Garage Switch
- Detect the hot Romex that goes to the laundry switch
- Install access box in attic to split that Romex
- Run Romex down to the box on the wall
- Install self-switched outlet
- Garage Project Light
- Screw hooks in ceiling
- Hang light
- Route power cable to switch
- Garage Ceiling Outlets
- Detect the switched Romex coming from the laundry switch
- Install access box in attic to split that Romex
- Install 2 1-gang boxes in ceiling
- Run Romex to boxes
- Install outlets
- Route power cables to the outlets
Networking
-
Security AP-
Run Ethernet through the attic -
Drill hole in office ceiling into attic -
Wire & Mount AP
-
- Second Upstairs AP
- Mount it to the ceiling
- Route the cable cleanly
- 8x outside security cameras
- ⚠So much work I don’t want to list it⚠
Server Room
-
Fix Bifrost reverse proxy entries -
Hvergelmir VGA isn’t working - Upgrade Bifrost for newer Pi4 8GB, likely needs to be reinstalled
- Route Server Wires on Wall
- Plan wiring
-
Buy longer USB-C - Install drywall anchors
- Install wire hooks
Arcade
- Hang arcade sides
- Line up and mark the arcade sides for cleat location
- Lay down some plastic to catch sawdust
- Drill holes for dowels in arcade sides
- Drill holes for dowels in cleats
- Trim & taper dowels
- Glue & hammer in dowels
- Install rubber bumpers
- Hang the sides on
- Arcade control board
- Undo the current rats nest of wires
- Install all the buttons, 8 still need to be drilled
- Drill out and install the cable pass-through
- Create channels through support
- Add more support beams to the box
- Install wire terminals
- Install boards
- Run all 240 switch wires where they need to go
- Run all 19 cables where they need to go
- Tie down all the wires and cables
- Cut and glue a new corner piece onto the control panel
- File the corners
- Mount the control board
- Install cup holders maybe???
Home Organization
-
Master bedroom improvements-
Empty out the wardrobe -
Move the wardrobe out of the bedroom -
Sell the wardrobe -
Build BILLY cabinets -
Install BILLY lights -
Organize cabinets
-
-
Reorganize downstairs storage closet
Misc
- Break down and organize firewood